The working terms of five industries: what each one means, and where it goes wrong between teams and partners.
Fashion and consumer goods
Spurby for fashion- Tech packThe specification a factory makes a garment from: sketches, measurements, materials, trims, construction and labelling, in one versioned document.
- Lab dipA small swatch of fabric dyed by the mill to match a brand’s colour standard, sent for approval before bulk dyeing.
- Strike-offA printed or embroidered sample of a design on the production fabric, sent for approval of colour, scale and placement before bulk printing.
- Fit sampleA sample garment made to check how a style fits on a body or dress form, with comments that feed the next round and the tech pack.
- PP sampleThe sample made from production fabric and trims, on the production line, that the brand approves before bulk production starts.
- Time and action calendarThe schedule of milestones from order to shipment, such as lab dips, samples, fabric, cutting and inspection, each with an owner and a date.
- Costing sheetThe breakdown of a garment’s cost, including fabric, trims, cut-make-trim, processes and margin, used to reach a target price.
- FOB priceThe price of goods loaded on board the ship at the port of export, after which freight, insurance and risk pass to the buyer.
- Proforma invoiceA preliminary invoice a supplier sends before shipment, confirming quantities, prices and terms, often used to release an advance.
- AQL inspectionA sampling inspection that checks a random sample from a production lot against an allowed number of defects, to accept or reject the lot.
Construction
Spurby for construction- RFIA formal question from a contractor to the design team, asking for clarification of drawings or specifications before work goes ahead.
- SubmittalInformation a contractor submits for the design team’s approval before ordering or installing, such as product data, samples or shop drawings.
- Shop drawingA detailed drawing prepared by a fabricator or subcontractor showing exactly how they will make and install a component.
- Issued for construction (IFC) drawingsThe revision of a drawing formally released for building, as opposed to drafts issued for review, tender or information.
- VariationA formal change to a construction contract’s scope, price or time, usually instructed by the client or its representative.
- Site instructionA written direction to the contractor from the architect, engineer or project manager, issued during construction.
- Notice of claimA contractual notice that a party intends to claim more time or money, which many contracts require within a fixed period.
- Lookahead programmeA short-term construction schedule, usually two to six weeks ahead, setting out which trades do which work and what each needs to be ready.
- Snag listThe list of defects and unfinished items that must be fixed before a building is handed over.
- RA billAn interim bill for work completed so far, based on measured quantities, used for progress payments on Indian construction projects.
Manufacturing and procurement
Spurby for manufacturing- Engineering change notice (ECN)The formal notice that a part’s design has changed, stating the new revision, the reason and when it takes effect.
- PPAPThe process a supplier follows to prove a part and its production process meet the customer’s requirements before series supply.
- First article inspection (FAI)A full inspection of the first part from a new or changed production process, checking every characteristic against the drawing.
- 8D reportA structured problem-solving report in eight steps, from containment to root cause to permanent corrective action, used with suppliers after a defect.
- ConcessionA customer’s permission to use or ship parts that don’t fully meet the specification, limited to a quantity, lot or period.
- Non-conformance report (NCR)A record that a part, material or process doesn’t meet its requirement, with what was found and what happens to the affected items.
- Advance shipping notice (ASN)An electronic notice a supplier sends before a delivery, listing what is in the shipment and when it will arrive.
- Call-offAn instruction to a supplier to deliver a quantity on a date, released against a blanket purchase order.
- Job workIn India, sending inputs or semi-finished goods to another business for processing, such as plating or machining, without transferring ownership.
Logistics and trade
Spurby for logistics- RolloverWhen a shipping line moves a booked container to a later vessel than the one it was booked on.
- Cut-offThe deadlines before a sailing by which a container must reach the terminal and its weight and documents must be filed.
- VGMThe declared total weight of a packed container, required under the SOLAS convention before it can be loaded on a ship.
- Draft bill of ladingThe proposed bill of lading a carrier or forwarder sends for checking before the final, original bill is issued.
- HS codeThe international product classification number customs authorities use to apply duties and controls to traded goods.
- Demurrage and detentionDaily charges for keeping a shipping line’s container beyond its free time: demurrage inside the terminal, detention outside it.
- Free timeThe number of days a container can stay at the terminal or in use before demurrage or detention begins.
- Proof of delivery (POD)The document, usually signed by the consignee, confirming that goods were delivered, with any remarks about shortage or damage.
- Customs house agent (CHA)A licensed agent who files customs declarations and clears goods through customs for importers and exporters.
Pharma and chemicals
Spurby for pharma- Technology transferMoving a manufacturing process or analytical method from one site to another, such as from development to a commercial site or a CDMO.
- Change controlThe quality-system process for proposing, assessing, approving and implementing changes that could affect a product’s quality or registration.
- GMP deviationA departure from an approved procedure, specification or instruction during manufacturing or testing, which must be documented and investigated.
- CAPAThe actions taken to fix the cause of a quality problem and stop it, or similar problems, from happening again.
- Certificate of analysis (CoA)A document from a manufacturer or lab reporting a batch’s test results against its specification.
- Master batch record (MBR)The approved, controlled instructions for making a batch of a product: materials, equipment, steps, parameters and checks.
- Process performance qualification (PPQ)The batches run to show that a commercial manufacturing process consistently produces product of the required quality.
- Quality agreementThe written agreement between a product owner and a contract facility that sets out each party’s GMP responsibilities.
- Out of specification (OOS)A test result outside the approved specification or acceptance criteria, which must be investigated before a batch decision.
- Field alert report (FAR)A report US drug application holders must send the FDA within three working days of learning of certain quality problems with distributed product.